Contracts and Execution
NRE 100% With PO
Execution Times, dead times and not programmed stops.
Contracts and Execution
- If the real volume differs from the quoted volume we reserve the rights to adjust the quoted price.
- Any additional requirements or variations not included in the initial request or drawing will be quoted at the time of request.
- External laboratory tests that might be necessary for initial validations are not included in our quote.
- PMA reserves the right to adjust the raw material cost according to the market value.
- Purchase orders are not cancelable nor returnable. In case it needs to be cancelled a penalization of 30% of the total value of the contract plus the total of the services and materials used have to be covered.
- Urgent requests must be notified for a feasibility review at production times and an expediting charge will be made for production.
- The Quote is based on a structural Pre-Design and base execution Conditions, adjustments could be made based on the final Structural Design, dimensional adjustments during the validation or definition, unknown external variables (maneuvers, protocols,Schedules, etc) which could affect the final cost. PMA Commits to absorb a 2% with the rest to be covered from the final client from the final balance.
Execution Times, dead times and not programmed stops.
- Working times considered under a schedule from 8 AM to 6PM from Monday to Friday, in case a different schedule is required it must be notified to check if there are no implications in the quoting.
- In case the conditions for the operations are stopped or interrupted for an attributable factor to the client. The lost hours will be considered as dead time. Which will be marked in the Project Log alongside a budget with such costs which will be considered as extras and should be covered in the immediate estimate.